PollRate Systems — SCADA Commissioning & Integration

SCADA COMMISSIONING & INTEGRATION

From field signal.
To clear control.

SCADA, solar, and power plant control systems. From inverter integration to utility interfaces, bring your project from configuration through verification and commissioning.

FIELD DEVICESCOMMUNICATIONSCONTROL SYSTEMS

Confidence starts with a verified signal.

Purposeful integration. Methodical commissioning.

01 / WHAT WE DO

The connection between
your field and your control room.

Commissioning and integration support across utility SCADA, solar plants, protection and controls, and PPC systems.

01

SCADA commissioning

Verify that what happens in the field is accurately represented at the operator interface.

  • Point-to-point signal verification
  • Alarm, status, and analog checks
  • Command and indication validation
02

Systems integration

Bring field devices, controllers, and supervisory systems together with a consistent approach.

  • RTU, PLC, and IED integration
  • SCADA database and point mapping
  • HMI configuration support
03

Communications & troubleshooting

Work through the connections and configurations that keep useful information moving.

  • Device communication checks
  • Data quality and polling review
  • Signal-path troubleshooting
04

Solar witness testing

Support solar project acceptance with coordinated witness testing, functional verification, and clear test records.

  • Witness test preparation and support
  • Observed response and indication checks
  • Results, discrepancies, and retest tracking
05

Protection & controls verification

Verify protection and control functions against approved project settings, logic, and test procedures.

  • Trip, permissive, and interlock checks
  • Relay status and alarm verification
  • Control logic and SCADA indication checks
06

Power plant controller systems

Integrate and verify PPC systems across the plant, connecting inverter-level operation with plant-level supervision and control.

  • Inverter-to-PPC communications and mapping
  • Setpoint, feedback, and response verification
  • PPC-to-SCADA and external interface checks
07

On-site commissioning services

Hands-on support at your facility to set up solar inverters, integrate the PPC, and verify the complete plant control path.

  • Inverter setup and communications configuration
  • PPC integration, point mapping, and setpoint checks
  • Field testing, troubleshooting, and handover

CUSTOM RTAC PROGRAMMING & SOLAR PLANT CONTROL

Your plant.
Your operating strategy.

Custom SEL RTAC project files and power plant control systems built around your equipment, site requirements, and operating preferences.

Coordinate solar inverters, site metering, SCADA, and utility interfaces through a unified control system. Choose manual operator control or fully automatic operation, with project-specific limits, communications monitoring, fault handling, and commissioning verification.

AVR

Automatic voltage regulation

Adjust reactive power using point-of-interconnection voltage feedback, with configured targets, deadbands, and operating limits.

PF

Power factor control

Regulate toward leading, lagging, or unity power factor targets within configured plant and inverter capabilities.

VAR

Reactive power control

Control site reactive power to a specified target, distributing requests across qualified available inverters.

ACTIVE POWER

Intelligent inverter allocation

Manage output limits, curtailment, and ramp rates. Allocate power across available inverters and redistribute demand within their operating capabilities.

MANUAL

Operator-directed control

Provide manual setpoints, start/stop commands, and inverter participation controls while retaining configured permissions and interlocks.

AUTOMATIC

Coordinated site operation

Support qualified automatic startup, continuous output adjustment, and controlled inverter return when communications, permissives, and operating conditions allow.

Connected data. Clear operating decisions.

Integrate meters, weather stations, inverter diagnostics, alarms, and utility or PJM telemetry. Configure communications-loss responses, fault handling, and recovery behavior for the site’s operating requirements.

CUSTOM HMI DESIGN & INTEGRATION

Built to your specifications.
For local or remote control.

PollRate Systems develops custom human-machine interfaces (HMIs) around the way you operate. Bring plant status, trends, alarms, and controls into a clear interface for local operators or authorized remote users.

Discuss your control system

Your site, in view.

  • Plant overviewSite metering, inverter status, equipment availability, and communications health.
  • Operating controlsAVR, PF, VAR, and active power setpoints with manual or automatic operation.
  • Alarms & trendsOperating history and clear indications to support troubleshooting and commissioning.
  • Local & remote accessUser permissions, control ownership, and interlocks tailored to your site.

END-TO-END SOLAR INTEGRATION

From the inverter
to the grid interface.

Connect the full information and control path, with verification at each interface.

  1. 01 / FIELD

    Inverters

    Measurements, status,
    and command response

  2. 02 / PLANT CONTROL

    PPC systems

    Plant-level setpoints,
    feedback, and control

  3. 03 / SUPERVISION

    SCADA & gateways

    Point mapping, telemetry,
    and operator visibility

  4. 04 / EXTERNAL INTERFACES

    Utility & PJM

    Project-specific telemetry
    and control connections

National Grid · FirstEnergy · PJM

Integration support for connections to National Grid, FirstEnergy, and PJM, including signal mapping, communications verification, and coordinated end-to-end testing against project-specific interface requirements.

Interface architecture and test scope are tailored to each project.

02 / HOW WE WORK

Clear scope.
Deliberate testing.
Practical handover.

Every project has its own equipment, requirements, and operating constraints. The work starts by understanding yours.

  1. 01

    Understand the system

    Review the scope, device interfaces, point lists, and commissioning requirements.

  2. 02

    Connect and configure

    Align communications, point mapping, and operator displays around the project’s needs.

  3. 03

    Test and resolve

    Work through agreed test procedures, document findings, and address discrepancies.

  4. 04

    Document and hand over

    Capture configurations, test results, and outstanding items for a clear transition.

03 / START A CONVERSATION

Let’s connect
your next project.

Planning a solar witness test, verifying protection and controls, or connecting inverters through a PPC to utility and PJM interfaces? Let’s talk about your scope.

Email Edward Davis